Continuous casting and hot strip milling are two successive production steps in the steel industry. In her thesis Imke Mattik develops model formulations to integrate the scheduling of continuous casters and hot strip mills. Aim is to reduce the waiting times of the pre-products, called slabs, between the production steps and at the same time to reduce the energy consumption. Along with two different model formulations extensive numerical tests and comparative analyses are provided.
Contents
Target Groups
The Author
Dr. Imke Mattik wrote her dissertation under Prof. Dr. Hans-Otto Günther’s supervision at the department of production management at the Technical University of Berlin.
The Editors
The series Produktion und Logistik is edited by Prof. Dr. Bernhard Fleischmann, Prof. Dr. Martin Grunow, Prof. Dr. Hans-Otto Günther, Prof. Dr. Stefan Helber, Prof. Dr. Karl Inderfurth, Prof. Dr. Herbert Kopfer, Prof. Dr. Herbert Meyr, Prof. Dr. Thomas S. Spengler, Prof. Dr. Hartmut Stadtler, Prof. Dr. Horst Tempelmeier and Prof. Dr. Gerhard Wäscher.