Data Center Construction - Made Simple and Interesting

Ask most people what happens inside a data center and they'll describe rows of blinking servers in a cold, humming room. Ask them how that room came to exist - how a patch of open land became a building capable of running thousands of machines without ever losing power, without ever overheating, without ever going dark - and the answers get much thinner. That gap is what this book is for.
Data center construction sits in an odd position. It borrows from commercial construction, industrial construction, and utility-scale power infrastructure all at once, but it isn't quite any of those things. A data center has to behave like a hospital in its tolerance for downtime, like a power plant in its electrical complexity, and like a precision instrument in its cooling requirements - while still, underneath all of that, being a building that has to be designed, permitted, financed, and physically assembled like any other. The people who build them speak in a dense mix of construction jargon and electrical engineering shorthand, and most books written about the subject assume the reader already speaks that language. This one doesn't make that assumption.
The approach here is to follow a single project from an empty field to a fully operational facility, and to use that project as a thread running through every chapter. We'll call the fictional company at the center of it Solstice Digital - a composite, not based on any real operator, built specifically so we can watch decisions get made and see their consequences play out without the noise of real-world politics or proprietary detail. Solstice Digital is planning its first hyperscale campus. Every part of this book checks back in on that project at the stage relevant to the chapter: watching the site selection team weigh a cheap plot of land against an unreliable power grid, watching the electrical contractors argue about switchgear lead times, watching the commissioning team deliberately fail a generator on purpose to prove the building can survive it.
None of this requires a technical background to follow. Where the book needs to explain how switchgear works, or why chilled water loops are designed the way they are, it will do so with analogies drawn from things most readers already understand - plumbing, traffic, insurance - because the underlying logic of data center systems is rarely as exotic as the vocabulary makes it sound. The goal is not to turn the reader into an electrical engineer or a construction superintendent. It's to get them to the point where they can sit in a room with either one, understand what's being discussed, and ask a good question.
The book is organized in five parts. The first asks why data centers are different from other buildings at all, and how the industry sorts itself into hyperscale, colocation, edge, and enterprise projects. The second walks through everything that has to be decided before construction starts - the site, the players, the redundancy level, the basic architecture of power and cooling. The third is the build itself, discipline by discipline, from the first cut of earth to the last cable pulled. The fourth covers commissioning, the often-underestimated process of proving that what was built actually works the way it was designed to. The fifth steps back to look at risk, safety, sustainability, and where the industry is heading.
>

septembre 2026, env. 244 pages, Data Center Construction - Made Simple and Interesting, Bd. 17, Independently published, Anglais
Independently Published
979-8-1745-0627-5

Autres titres sur ce thème